The FV600 is a powerful and robust air extractor that can be used for either vacuuming or jetting air into specific areas. This high-performance fan has an energy consumption of only 4.25 kW per hour and is compatible with a three-phase power supply. The plug and play unit has a maximum airflow of 12,100 mยณ per hour, which is suitable for providing large circulations of cool air for a wide range of sectors including construction, demolition, excavation, tunnelling and painting.
Feature
plug in and switch on
for deployment in noise-sensitive areas
will stand up to the rigours of industrial use
ensuring low running costs
allowing simplified operation
affording customer peace of mind
forklift and crane points
cooling inaccessible areas
Air flow (max) | 12100 m3/h |
---|---|
Power supply | 415 V 3 ph 50 Hz +E Run 6 A |
Plug type | BS4343 5 pin 16 A 415 V |
Generator size | 20 kVA |
Duct length (max) | 40 metres |
Duct size | Inlet 600 mm Outlet 450 mm |
Noise level (max, with duct) | 83 dBA @ 1 metre |
Weight | 245 kg |
Dimensions (L x W x H) | 1115 x 1115 x 1350 mm |
Control | Manual |
Average power consumption | 4.25 kW/h |
10M x 5 PIN 16 AMP 415V EXTENSION LEAD 2.5MM DIA
20M x 5 PIN 16 AMP 415V EXTENSION LEAD 2.5MM DIA
450MM X 8M HD VENT DUCTING WITH CLAMP
600MM X 8M HD VENT DUCTING WITH CLAMP
Removal of welding fumes
Demolition
Tank cleaning
Agriculture
Sewer maintenance
Tunnel construction
Construction
Paint work
Confined space working
Elimination of smoke and dust
"*" indicates required fields
Use our simple Cooling and Heating Calculators to work out which of our products would suit your requirements best.
Electric
38,000 m3/h
11.6 kW/h
Gas
100 kW
12.5 l/h Gas Oil
Electric
3,600 m3/h
265 W/h
Electric
37,000 m3/h
2.3 kW/h
Electric
7.33 kW
159 m3
Electric
1,700 m3/h
1.15 kW/h
Oil
32kW
620 m3
Electric
609m3/h
210 W/h
Extreme weather events are becoming the new normal. As a result, healthcare environments are feeling the strain as heatwaves, rising
As summer arrives, so do the challenges for hotel operators. With longer daylight hours, higher occupancy, and soaring temperatures all
A successful film set is built on timing, talent, and precision โ but none of that works without the right
Stay connected with Andrews Sykes and receive new blog posts in your inbox